How long a website takes depends less on the code than on the content. A five-page site with photos ready can be done in days. A site with a catalogue, several languages and copy still to write takes weeks or months.
What decides the timeline
- The number of pages, and whether they all follow the same template.
- The content. Photos and copy that are ready save weeks.
- The languages. Each language is another set of text to write and review.
- The content panel. A site the client updates takes longer to set up and test.
- The decisions. Every round of changes depends on someone replying.
What causes delays
The domain is a common delay. If it is registered in an account nobody can access, it has to be recovered before the site can be connected. The same happens with old Google or social media accounts.
An example
The website of Moto ÀS, a motorcycle dealer with a catalogue, was agreed on 9 November 2026 and was live on the 18th. The missing information was gathered in a single visit to the shop.
At Kobreno
Timelines range from a week to a few months. Because the preview is built before the quote, most of the structure is already in place when the project starts.
Ask for a preview at hello@kobreno.studio.